Retrofit of a bottle packaging line for DW Reusables
The line that packs bottles into crates at DW Reusables in Hum na Sutli consists of four segments. Three of them had no PLC control whatsoever - they ran purely on switches - and ENSO replaced the only existing PLC, an outdated Siemens S7-300, with a new S7-1200 controller.


Reviving the line for packing bottles into crates for DW Reusables
DW Reusables in Hum na Sutli runs a line for packing bottles into crates made up of four segments: a crate depalletiser, a bottle depalletiser, a packer that places the bottles into empty crates, and a palletiser for full crates at the end of the line.
Of the entire line, only the bottle depalletiser - a Transpak machine from Slovenia - had any PLC control at all: an outdated Siemens S7-300 with an HMI panel that no longer worked. The other three segments had no PLC whatsoever - all actuators were switched directly via switches and contactors, with no automated logic.
A new PLC on all four segments, based on the existing electrical documentation
The line works in four steps: the first segment depalletises the bottle crates, the second depalletises the bottles themselves, which are then transported together with the crates to the third segment - the packer that places the bottles into the empty crates. At the end of the line, the palletiser stacks the full crates onto pallets.
Complete electrical documentation existed for the three segments without a PLC - the German equipment manufacturer had documented everything in detail - so we relied on it to create the new EPLAN project and write the PLC programs from scratch.
On the bottle depalletiser we replaced the old Siemens S7-300 with a new S7-1200 controller and renewed the wiring.
Alongside the PLC and EPLAN work, the pneumatics were also renewed - some of the cylinders and valves were kept, worn ones were replaced, and new air preparation units with pressure switches were installed on all four segments. The existing SEW brake motors and frequency inverters (Danfoss, Lenze, Delta) were integrated into the new PLC via conventional electrical signals.
A working, networked line with remote access